Customization options — PowerCore3 - ProMod / X275
EFI System - Choose your EFI (required): Holley EFI - Any, Fueltech, Haltech ECU (any), Big Stuff 3/4, FAST XFI, MS3 Pro, Universal — ()
Holley EFI - Any (+100) — EFI System - Choose your EFI
Fueltech (+150) — EFI System - Choose your EFI
Haltech ECU (any) (+150) — EFI System - Choose your EFI
Big Stuff 3/4 (+150) — EFI System - Choose your EFI
FAST XFI (+150) — EFI System - Choose your EFI
MS3 Pro (+150) — EFI System - Choose your EFI
Universal (+200) — EFI System - Choose your EFI
Online Build Form - Timeline Agreement (required): Forms Not needed (no Switch Panel, non customizable pkg), I agree to fill out the RWS Online Switch Panel form and agree that my build timeline doesn't start until I submit the signed form (When Adding Switch Panel to non customizable kit), I agree to fill out the RWS Online Switch Panel and PC3 Checklist forms and agree that my build timeline doesn't start until I submit the signed form (When ordering 100% Customizable Pkg) — ()
Forms Not needed (no Switch Panel, non customizable pkg)
I agree to fill out the RWS Online Switch Panel form and agree that my build timeline doesn't start until I submit the signed form (When Adding Switch Panel to non customizable kit)
I agree to fill out the RWS Online Switch Panel and PC3 Checklist forms and agree that my build timeline doesn't start until I submit the signed form (When ordering 100% Customizable Pkg)
Option 1 - Solid State Relay Upgrades (required): No SSR Relays Needed (Blower Car), Yes, EFI Dump Valve wiring w/ Holley SSR, Yes, add Bump/Creep Integration w/ Holley SSR, Yes, add 2 SSR Relays for Trans-Brake Bump + Dump Valve EFI Control — ()
No SSR Relays Needed (Blower Car)
Yes, EFI Dump Valve wiring w/ Holley SSR (+175) — Option 1 - Solid State Relay Upgrades
Yes, add Bump/Creep Integration w/ Holley SSR (+175) — Option 1 - Solid State Relay Upgrades
Yes, add 2 SSR Relays for Trans-Brake Bump + Dump Valve EFI Control (+350) — Option 1 - Solid State Relay Upgrades
Option 2 - 75 Amp Fuel Relay Kits (required): No Fuel Pump (Mechanical), 1 Fuel Pump, 2 Fuel Pumps, Smart Coil Relay - 75A, Smart Coil Relay and Fuel Pump Relay, Smart Coil Relay and 2 Fuel Pump Relays, Intercooler Relay - 75A, Intercooler and Fuel Pump Relay Kit, Intercooler / Fuel Pump / Smart Coil Relay Kit, Intercooler / 2 Fuel Pumps / Smart Coil Relay kit — ()
No Fuel Pump (Mechanical)
1 Fuel Pump (+75)
2 Fuel Pumps (+150)
Smart Coil Relay - 75A (+75)
Smart Coil Relay and Fuel Pump Relay (+150)
Smart Coil Relay and 2 Fuel Pump Relays (+225)
Intercooler Relay - 75A (+75)
Intercooler and Fuel Pump Relay Kit (+150)
Intercooler / Fuel Pump / Smart Coil Relay Kit (+225)
Intercooler / 2 Fuel Pumps / Smart Coil Relay kit (+300)
Option 3 - Billet E-Stop / Dome Light Switch Upgrade (required): No, Not needed, Yes, please add billet E-stop to switch panel (Removes 1 switch), Yes, please add 2 LED Dome Lights w/ Base Dome Switch, Yes, please add 2 LED Dome Lights w/ Base Dome Switch w/ HD E-stop — ()
No, Not needed
Yes, please add billet E-stop to switch panel (Removes 1 switch) (+65) — Option 3 - Billet E-Stop / Dome Light Switch Upgrade
Yes, please add 2 LED Dome Lights w/ Base Dome Switch —
Yes, please add 2 LED Dome Lights w/ Base Dome Switch w/ HD E-stop —
Option 4 - Switch Panel Options (required): No Switch Panel Needed, 8 Button CAN Keypad In-Dash Pkg w/ Harness, 12 Button CAN Keypad In-Dash Pkg w/ Harness, 12 Button CAN Keypad Pkg w/ Harness + Roll Cage Box w/ Dome Lights, 8 Switch Roll Cage Panel w/ 2 Dome Lights, 6 Switch Roll Cage Panel w/ 2 Dome Lights, 7 Switch Roll Cage Panel w/ 2 Dome Lights, 9 Switch Roll Cage Panel w/ 2 Dome Lights, 10 Switch Roll Cage Panel w/ 2 Dome Lights, 11 Switch Roll Cage Panel w/ 2 Dome Lights, 12 Switch Roll Cage Switch Panel w/ 2 Dome Lights — ()
No Switch Panel Needed
8 Button CAN Keypad In-Dash Pkg w/ Harness (+1195) — Option 4 - Switch Panel Options
12 Button CAN Keypad In-Dash Pkg w/ Harness (+1395) — Option 4 - Switch Panel Options
12 Button CAN Keypad Pkg w/ Harness + Roll Cage Box w/ Dome Lights (+1695) — Option 4 - Switch Panel Options
8 Switch Roll Cage Panel w/ 2 Dome Lights (+470) — Option 4 - Switch Panel Options
6 Switch Roll Cage Panel w/ 2 Dome Lights (+410) — Option 4 - Switch Panel Options
7 Switch Roll Cage Panel w/ 2 Dome Lights (+440) — Option 4 - Switch Panel Options
9 Switch Roll Cage Panel w/ 2 Dome Lights (+500) — Option 4 - Switch Panel Options
10 Switch Roll Cage Panel w/ 2 Dome Lights (+540) — Option 4 - Switch Panel Options
11 Switch Roll Cage Panel w/ 2 Dome Lights (+560) — Option 4 - Switch Panel Options
12 Switch Roll Cage Switch Panel w/ 2 Dome Lights (+605) — Option 4 - Switch Panel Options
Option 5 - Billet Cage Clamps for Relay Module (required): No, Not Needed, Yes, 1.25" Billet Cage Clamps, Yes, 1.50" Billet Cage Clamps, Yes, 1.625" Billet Cage Clamps, Yes, 1.75" Billet Cage Clamps — ()
No, Not Needed
Yes, 1.25" Billet Cage Clamps (+180)
Yes, 1.50" Billet Cage Clamps (+180)
Yes, 1.625" Billet Cage Clamps (+180)
Yes, 1.75" Billet Cage Clamps (+180)
Option 6 - Cooling Circuits 12V or GND Activation (Can be spares if not needed) (required): 12V Triggered Cooling Circuits | Water Pump, Fan 1, Fan 2, Trans Fan | w/ dual triggers (Switch + ECU), Ground Triggered Cooling Circuits | Water Pump, Fan 1, Fan 2, Trans Fan | w/ dual triggers (Switch + ECU) — ()
12V Triggered Cooling Circuits | Water Pump, Fan 1, Fan 2, Trans Fan | w/ dual triggers (Switch + ECU)
Ground Triggered Cooling Circuits | Water Pump, Fan 1, Fan 2, Trans Fan | w/ dual triggers (Switch + ECU) (+50)
Option 7 - Power Windows (required): No Power Windows, Dual Power Window's w/ Switch Panel or customer/stock switches, Dual Power Window Option w/ Stand Alone Dual Switch Combo — ()
No Power Windows
Dual Power Window's w/ Switch Panel or customer/stock switches —
Dual Power Window Option w/ Stand Alone Dual Switch Combo —
Pre-Set Circuit List (Short Build Time Line) OR Custom Build (required): Non Customizable outside of options selected - (8-10 WEEK Lead Time), 100% Custom Built to Spec based on Customer Checklist and options Selected Above - (18-25 WEEK Lead Time) — ()
Non Customizable outside of options selected - (8-10 WEEK Lead Time)
100% Custom Built to Spec based on Customer Checklist and options Selected Above - (18-25 WEEK Lead Time) (+695)